Projects / Pictures and details

Tervaete bridge - 03.001

Program

Complete design (including structural studies). The project was won after a design competition in collaboration with general contracting company Depret.

Concept

Mobile bridge of a new typology. A two stayed bridge where one stay is incorporated into a piston. Both approach spans are mixed concrete-steel constructions while the mobile part consists of an orthotropic steel deck. The mobile span has a length of 16m, the two fixed spans have a length of 11m (total length 38m).

Specific features

The piston also functions as a stay. New innovative topology for a mobile bridge.

Engineering design :

2002

Construction :

2004

Architect :

Ney&Partners

Client :

Flemish Community

Site :

B-Diksmuide

Dimensions :

38 m

Total budget :

1000000 € Vat Excl.

State :

Completed

Images credits :

Ney&Partners