Projects / Pictures and details

Harchies - 10.012

Program

Complete study

Concept

The new Harchies bridge, spanning 70m, replaces an existing prestressed concrete bridge on the Nimy-Blaton Canal. The replacement is required because of the corroded strands of the latter.

Specific features

The new structure is a bowstring bridge with integral abutments : the thermal expansions are compensated by soil-abutment interaction. This bridge typology therefore is jointless. The arch has a trapezoidal shaped cross section, with the lighting integrated inside. The steel structure and concrete abutments are connected by post-tensioned steel rods.

Engineering design :

2010

Construction :

2011-2012

Architect :

Ney&Partners

Client :

SPW - Service public de Wallonie

Site :

B-Bernissart

Dimensions :

70 m

State :

In study

Images credits :

Ney&Partners