Projects / Pictures and details

Riva Bella - 08.026

Program

Complete structural analysis, restoration and transformation of the High School Riva Bella.

Concept

Redevelopment of the High School for the organization of High school activities and the social promotion.

Specific features

Existing building is built out of a half prefabricated construction. The steel structure is preserved and adapted to the new needs, and to the new envelope that allows the building to meet the low-energy standards.

Engineering design :

2009

Construction :

2010-2011

Architect :

Atelier d'Architecture Alain Richard

Client :

S.P.AB.S, French Community

Site :

B-Braine-l'Alleud

Dimensions :

4500 m2

State :

Completed

Images credits :

AA-AR; N Bomal pour la cfwb