Projects / Pictures and details

Woluwe II - 05.018

Program

Structural study : new sunscreen, new canopy, different interventions. Study of the structural capacity and fire resistance of the existing concrete structure.

Concept

Adaptation of a 1975 concrete office building. Different interventions of the structural elements were made such that the modernization of new technical installations and a new architectural concept became possible. Every floor was stripped of all its elements, the existing structure has been reinforced where the new archives and technical rooms are being located. A new entrance canopy, a sunscreen of steel and aluminum, smoke evacuation channel …

Specific features

No plans of the present situation of the reinforcement were available. Based on the formwork plans and structural measurements assumptions for the reinfocement were formulated.

Engineering design :

2005

Construction :

2005-2006

Architect :

ASSAR (TS:Tractebel / IA:Venac)

Client :

Fortis Real Estate Asset Management

Site :

B-Brussels

Dimensions :

13234 m2

Total budget :

7250000 € Vat Excl.

State :

Completed