News
Tervaete Bridge - 01/10/2004
After months of
preparation, the new Tervaete bridge will be placed over the
river Yser in Diksmuide (30.09.2004).
This bridge consists of two fixed spans of 11m and
one mobile span of 16m.
The central steel span is stayed with a tension rod
and a piston that opens
and closes the bridge.
This piston will be finely tuned next week.
|