Development Masterplan Ooijen-Wanssum, start construction site (NL) - (April 10, 2018)

Construction sites for the Masterplan Development Ooijen-Wanssum started this year. The first bridges to be built are the steel pedestrian bridge spanning the future Wanssum Rondweg and the Ooijen bridge. The latter is a semi-integral concrete bridge with 10 spans and a total length of 200 m. The concrete works are built span by span on a movable formwork. In total 8 bridges/tunnels will be built for this Design & Build project won by the consortium Dura-Vermeer-Ploegam in collaboration with Ney & Partners.